How Quickly Can Ductwork Fabrication Be Done

Share on facebook
Share on google
Share on twitter
Share on linkedin

When adding a new unit or expanding the additional system, ductwork replacement may be necessary. The process requires careful planning and coordination, so this alone could affect how long a system takes to build. Ductwork fabrication can completed in a matter of days depending on several factors.

Factors affecting the amount of time it takes to complete a system

Design of system-The design of the system is a factor. A more complex design may require more planning and labor. Intricate planning may be required if there are efficiency requirements that must be made. Repairs are almost unavoidable whenever a system is being upgraded. There may be multiple temperature controls that have to be incorporated into the design, which affects complexity of the overall system. If additional supply ductworks are needed than originally required, then the size of the system is affected.

Size of the project-The size of the project may vary. For example, there may be multiple stories to account for in the planning, which could affect the amount of labor that could be required. The square footage of each room affects the length of the project.

Improvement or replacement-If the system upgrade involves simply replacing the existing unit with a similar one, then there will be little changes to the design in most cases. This means that ductwork may need moderate improvements to resolve leaks or vulnerable areas.

Quality of existing ductwork-If the ductwork is aging and failing in multiple areas, then the ductwork has to be replaced. If there are energy efficiency concerns, then the ductwork should be replaced.

Permitting-Agencies may affect the timeline. The permit application may take longer to process if working with a particular agency. The duct installation project timeline could be affected if there are any delays in processing the application.

Accessibility of the ductwork-If the ductwork isn’t accessible, then the project will take longer to complete. The ductwork can be replaced quickly if it is very accessible.

How long does it take to install a ductwork?

The ductwork project takes between 1 to 4 days. The ductwork is mostly impacted by the size of the project. If there are no unexpected challenges, then the system will take only a few days to install. In some cases, the installation can be completed in one day.

New ductwork may be required if a new HVAC system is being installed. Multiple variables affecting the timeline of the project such as the design of the system and the size of the project can also affect the overall cost of the system. Most installation projects can be completed in a matter of days.

Still have questions?  Call O.C. McDonald today (408) 295-2182